Logging Work from Issue Screen
There are two different areas available to log work on the issue screen:
1. “Log Work (WP)” Option from Issue View
The worklog dialog can be opened from the issue view screen by clicking the three dots (•••) in the upper-right corner.
From the dropdown menu that appears, select “Log Work (WP)” to open the worklog dialog and enter a work log.
2. WorklogPRO Panel in the Issue Context
Work can also be logged via the WorklogPRO panel located in the issue context section.
Within this panel, the Log Work functionality is available under the Action section, allowing users to create a new work log entry.
Both methods provide the same functionality and can be used based on user preference.
Time Tracking Screen
When the relevant Log Work fields are clicked, a Time Tracking screen opens to allow users to create a worklog entry.
Through this screen, users can quickly and easily log time spent on the related issue.
The Time Tracking screen enables users to:
Enter the time spent
Select the date
Add a description
Complete the logging process in a single step
Using the Time Tracking Screen
The Time Tracking screen includes several features designed to improve flexibility and user experience:
1. User Field
Through the User field, if the user has the “Worklog for Others” permission, a worklog entry can be created on behalf of another user.
This feature provides flexibility, especially for team leads or users responsible for managing time entries centrally.
For more detailed information about permissions, please refer to the documentation:
Permissions
2. Attribute Visibility and Customization
Configured attributes are displayed directly on the Time Tracking screen.
While creating a worklog entry, users can fill in these attributes to customize the record. This allows time entries to be categorized and detailed according to organizational needs.
For more detailed information about attributes and accounts, please refer to the documentation:
Attributes & Accounts
3. Day Agenda View
Clicking the ≡ icon on the Time Tracking screen opens the Day Agenda section.
Through this view, users can:
See existing worklogs for the selected date
Preview the worklog before saving
Adjust the duration visually by extending or shortening the issue directly within the calendar view
Drag and drop the issue to a different time slot or day to quickly adjust the scheduled time
Automatically update the Time Spent field based on changes made in the calendar
This functionality enables users to manage and edit time entries in a visual way.
4. Worklog Description
The Worklog Description field allows users to add comments or detailed explanations to their work log entries.
Optionally, the “Copy to Issue Comments” feature can be enabled to automatically add the worklog description as an issue comment. This helps create a more controlled and traceable communication structure within the issue.
Copy to Issue Comments and Role-Based Restrictions
When the “Copy to Issue Comments” option is enabled, a lock (🔒) icon appears next to the field.
By clicking this lock icon, the visibility of the related worklog comment can be restricted. Users can select one or more roles they belong to within the project, ensuring that the comment is visible only to users who have the selected role(s).
If a user selects a role that they do not belong to, the worklog entry cannot be saved.
If no role is selected (🔓), the comment will be visible to all users (public visibility).
This functionality enables role-based visibility control for worklog comments, providing greater flexibility and governance over project communication.